Back again for 2024 by popular demand! We had the inaugural run of this route last year and had a swampy good time with our swamp dogs.
Airport pickups may available from CLT. Send us a note to coordinate.
Lodging:
Friday - Relax Inn Monroe / 611 W Roosevelt Blvd, Monroe, NC 28110 / (704) 289-4581
The Relax Inn, while a bit dated, should be just fine for a half a night of sleep. There are several more modern lodging options if you desire up the street. These more modern hotels were not chosen due to the difficulty of returning to them by bike at the finish of the ride.
Saturday - Quality Inn / 817 Radford Blvd, Dillon, SC 29536 / (843) 774-0222
There is a bridge out at 282km and the new route posted above (as of2/13/2024 @ 12:00pm) includes a detour to avoid the bridge out. It is a rideable dirt road that is very brief. We do our utmost to utilize safe roadways and there are rare occasions, such as this, that a brief dirt section is the most appropriate route. We apologize in advance for the unpaved road surface. The bridge is scheduled to be complete in may 2025.
Back again for 2024 by popular demand! We had the inaugural run of this route last year and had a swampy good time with our swamp dogs.
Airport pickups may available from CLT. Send us a note to coordinate.
Lodging:
Friday - Relax Inn Monroe / 611 W Roosevelt Blvd, Monroe, NC 28110 / (704) 289-4581
The Relax Inn, while a bit dated, should be just fine for a half a night of sleep. There are several more modern lodging options if you desire up the street. These more modern hotels were not chosen due to the difficulty of returning to them by bike at the finish of the ride.
Saturday - Quality Inn / 817 Radford Blvd, Dillon, SC 29536 / (843) 774-0222
There is a bridge out at 282km and the new route posted above (as of2/13/2024 @ 12:00pm) includes a detour to avoid the bridge out. It is a rideable dirt road that is very brief. We do our utmost to utilize safe roadways and there are rare occasions, such as this, that a brief dirt section is the most appropriate route. We apologize in advance for the unpaved road surface. The bridge is scheduled to be complete in may 2025.
Monroe, NC Asheville International Randonneurs ashevillerandonneurs@gmail.com America/New_York public